Timber framed building

We extended the existing single storey workshop then added offices above at Yorkshire Metal Traders Limited in Armley. Shires Timber manufactured the frame, trusses and provided the calculations. Once on site the frame was erected and secured in 4 hours and was watertight with-in a week. The whole job took 5 weeks to complete, 4 offices, tea room, shower room and separate WC room, all on the first floor.

Eden Crescent Leeds

Complete refurbish

  .

 


Burst water tank in the loft whilst the owners were on holiday, left running for 9 days. Replaced all ceilings, insulation, the majority of the walls, bathroom fixtures & fittings, all the timber doors/frames/skirting, kitchen and appliances, carpets. Re-decorated throughout. Insurance paid out £36,000 for the building works. These works were completed in a four week period.

Bentley Builders

Quality workmanship at realistic affordable prices.

Loft Conversion

Beckett's Park Drive, Leeds6

Added a new bedroom, study and a  WC/shower en-suite, we kite wound the stairs on the landing without the loss of any bedroom space below.