7 Harrowby Road LS16 5HN

Remove a rotting & unstable timber porch & replaced with a veranda with 6x6 posts set in metal clamps & 8x2 ceiling joists all clad in white UPVC cladding, all but matched the original flooring

Installed a single ply decking & ornate powder coated railings.

King George Avenue LS18 5LB

Added an additional storey creating a family room and extra bedroom using roof trusses above an existing garage added a front porch, opened up the hallway, installed additional radiators and a downstairs toilet. Used re-claimed roof tiles to make it appear not like a 'new job'

Renovated the kitchen and bathroom. Started 27th Sep completed 8th Nov all signed off by BI

45 Cotefields Avenue LS28 5EE

Demolished the existing outhouse.

Built a side extension for a proposed dining

room/office, knocked through to kitchen & increased the opening, inserted structural steels.

Once the footings were excavated & concreted started 28th December complete & signed off

17th January 2020

46 Park View Avenue LS4 2LH

Possibly the smallest extension we have done. Converted an old coal house and internal pantry into a  combi-toilet and separate shower cubical. Had to re-locate the gas meter and electrical distribution board. Removed side door & replaced with a window to enable wall units for the new fitted kitchen we completed + rear French window + step

Alton Cars group Leeds

We have recently completed roofing works in the following locations for Alton Cars; Nottingham, Harrogate, Hull, Huddersfield, Sheffield, Derby, Barnsley and Leeds. Pictures of Nottingham body shop after changing the old sky lights

25 Farar Lane LS16

Knocked down existing conservatory to extend the dwarf wall and make a new summer room, adding a dormer bedroom and reconfiguring upstairs, will up-date.

The Knoll Ossett (revisited)

Our next project...removed a prefabricated double garage to be replace in brick/block carport and workshop...will update

36 Heath Drive Boston Spa LS23 6PB

Installed new underground main drainage from the front to the rear main sewage drains. Divided the garage & fit a new side door & toilet window re-modeled the garage into a utility room, installed a new boiler & pump a WC enclosure knocked through to kitchen installed steels & removed various supporting walls, over boarded throughout & plastered to 'open up' the kitchen area, installed new rear French doors to let more light in. The client & family were still living in the house so we had to clean and vac & dust every night. Started 15th Nov completed 12th Dec..al signed off by Building Inspector.

Monk Bridge Street LS6

Was asked to take over from a previous builder and provide a watertight shell & first fit joinery & replace all the windows/doors, re-locate the gas to an external cavity box. He has he had his own finishing trades, we completed in 15 days in challenging times for materials during Covid-19

534 Stonegate Road LS17 6EU

Complete external & internal renovation re-wired, new staircase, plastered throughout double dormer bedroom with en-suite, rear kitchen extension, knock through 2 small bedrooms to facilitate new bathroom, replaced existing timber windows with Anthricite UPVC windows & doors, new kitchen, hacked existing pebble dash off & replaced with K-rend. Excavated existing macadam drive and reduced the levels, imported 120 tons of hardcore then laid a block paved driveway, removed 60 metres of privet & replaced with fencing, laid Astra Turf to the rear garden. Started 11th Feb completed 3rd July all signed off by BI